An incoming request becomes a clear preparation pack, with the source and the next decision beside it.
03Sample requests
00Packs reviewed
01Human review step
↳Try RFQ-1042: add the missing quantity, check the source, then review the pack.
RFQ-1042 / Preparation pack
Cooling pumps for the new assembly line
Bergwerk Systems · Mara Keller · Purchasing
Information needed
1 Request received
2 Check information
3 Human review
Source information 02 files
↗ incoming-request.txt · Sample email
From Bergwerk Systems
Hi Alpine team, please prepare an offer for AP-40 circulation pumps for our new assembly line. The supply is 230 V and the required flow is 40 litres per minute. We would like the brief ready by 18 September. Thanks, Mara.
◇ approved-catalogue.pdf · Sample record
Approved product information
AP-40 · Water circulation · 40 L/min · 230 V · Indoor installation